Farm Facilities

Farm Building and other structures

Sl.
No.
Name of the Building Present Utility Total Plinth Area(m2)
1. Thrashing Floor II & III Thrashing purpose 292.82
2.  Barbed wire

fence (Eastern side)

Protection from animals and other unauthorized persons
3. Trainees Hostel Hostel for farmers and other trainees 378.55
4. Rat Proof Godown Godown 102.50
5. Cattle and Implement shed For keeping implements 140.92
6. Screen House For raising nursery plants 103.49
7. Thrashing Floor Thrashing purpose 100.00
8. Sheep shed & Isolation shed Maintenance of goats 107.87
9. Prof. & Head Quarters Staff quarters 210.00
10. ASP/AP Quarters (Two quarters) AP-1, AP-2 Staff quarters 236.39
11. ASP/AP Quarters (Two quarters) AP-3, AP-4 Guest house and staff quarters 236.39
12. Technical / Administrative staffs quarters – 2 Nos.

O.S-1, O.S-2

Staff quarters 130.50
13. Providing barbed wire fencing around farm other than eastern side Protection from animals and other unauthorized persons 3,364
14. Formation of roads Movement of vehicles and farm staff 4,845
15. External water supply arrangement Providing water supply to staff quarters and animal shed and office
16. Mist chamber– I To keep nursery plants 60.00
17. Mist chamber– II To keep nursery plants 60.00
18. Mist chamber– III To keep nursery plants 60.00
19. Generator room To provide electrical power supply 14.71
20. Metrological station with barbed wire fencing To record observations and to protect from animals and unauthorized persons 2200
21. Ground level water tank To store water 60.00
22. Pump room in C2 Field To supply water 4.90
23. Pump room in A1 Field To supply water to main building 4.90

 

24. Sump To store water 6.50
25. Associate Professors quarters No.-1

ASP-1

Staff quarters 173.00

 

26. Associate Professors quarters No.2

ASP-2

Staff quarters 173.00

 

27. Assistant Professors quarters AP-5 Staff quarters 110.00

 

28. Rat Proof godown To keep farm produce and inputs 70.29
29. Implement shed To keep farm implements 48.99
30. Other staff quarters O.S-3 Staff quarters 52.50
31. Asst. Prof. Quarters AP-6, AP-7, AP-8 & AP-9

(4 quarters)

Staff quarters 299.60

 

32. Toilet for gents hostel Gents toilet 22.15
33. Toilet block to lady students Ladies toilet 23.40
34. Vehicle shed Vehicle shed
35. Labour shed, toilet and bathroom Labour rest room
36. B3 Borewell –

Depth 265 ft. Dia – 6.5 inches

37. C3 Borewell

Depth 230 ft. Dia – 10 inches